Skip to content
i-Kanban · Built around continuous flow

The Kanban tool engineering teams actually keep.

A delivery platform wired into cycle time, throughput, and WIP aging — so your team spots blockers in minutes, not after the retro. Sticky-note simple on the surface, analytics-deep underneath.

14-day trial · work-email gated · no credit card

  • Median cycle time 3.4d ▼ 41% vs. previous tool
  • Throughput / 14 days 187 cards shipped
  • WIP aging · at risk 4 / 28 flagged by flow-score
Payments · Release 24.11
Backlog 14
i-K-2411Stripe retry hooks
i-K-2412Refund webhook v2
i-K-2413Card vault rotation
In progress 6
i-K-23893DS step-up flow
i-K-2390Idempotency keysaging 11d
i-K-2394FX rate caching
Review 3
i-K-2382SCA exemptions
i-K-2384Webhook signing
Done · 14d
i-K-2371PSD2 audit log
i-K-2373Card BIN lookup
i-K-2377Currency switcher

Product · Cycle-time intelligence

Where does the bottleneck actually live?

Every card carries a flow-score derived from cycle time, throughput, and WIP aging. At-risk cards surface 3.4× earlier than the leading competing Kanban tool — so the team fixes the queue before the retro.

app.i-kanban.net / boards / payments-24-11 / analytics
i-Kanban analytics dashboard showing cycle time histogram, throughput chart, and WIP aging panel.
Flow-score engine · proprietary algorithm · surfaces at-risk cards 3.4× earlier than leading competitors.

Why teams switch

Built around the four metrics your current Kanban tool quietly ignores.

Most Kanban boards stop at To-do / Doing / Done. i-Kanban treats continuous-flow measurement as the product — every release ships against the same four metrics our own team uses.

  1. 01

    Flow-score, not just a status column

    A proprietary 0–100 score per card combining cycle time, throughput, and WIP aging. At-risk cards bubble up before standup — average 3.4× earlier detection than competing Kanban tools, based on customer surveys.

    3.4× earlier at-risk detection · avg., customer survey
  2. 02

    A WIP-limit coach that won't shut up

    Set a column limit once. The coach flags over-limit work in real time, blocks new "in progress" pulls, and emails the owner when a card has aged past your team's agreed threshold. Customers report a 41% average lead-time reduction within the first 90 days.

    41% avg. lead-time cut in 90 days · customer survey
  3. 03

    Aging detection tied to your SLA, not ours

    Define what "stale" means per column. The board surfaces aging cards alongside the WIP count and the current cycle-time percentile, so engineering managers triage by exception instead of by scrolling.

    11d median max-aging threshold for engineering teams
  4. 04

    Cycle-time breakdowns you can paste in a memo

    Slice cycle time by column, owner, label, priority, or epic. Compare two-week windows in one click and export the chart as SVG — your CFO will not notice you used a Kanban tool.

    12 default dimensions · zero config to start

Integrations

Drops into the stack you already run.

Eight native two-way sync partners and an open API — no middleware, no Zapier-only paths, no "we're working on it" answers. Integrations are independent; i-Kanban is not an official partner of any listed vendor.

  • Issues ↔ cards · commits ↔ comments
  • MRs ↔ cards · CI status inline
  • Two-way issue sync · bidirectional comments
  • Project ↔ board · state ↔ column
  • Card events → channels · thread replies
  • Frames → cards · comment threads synced
  • 3000+ apps · trigger on column moves
  • REST + webhooks · typed SDKs · rate-limit transparent

Template library

240+ boards, ready to clone.

The largest pre-built Kanban template library in the industry — covering engineering, design, marketing, ops, and customer support. Every board ships with WIP limits, aging thresholds, and flow-score baselines already configured.

Engineering sprint board

WIP limits per column · aging alert at 5 days · flow-score baseline set from your last 30 cycles.

Engineering

Design crit queue

Pull from "Ready for crit" → 2 reviewers max → auto-archive after feedback sign-off.

Design

Customer support triage

SLA-aware aging · ticket → card sync · escalation lane reserved for P0 incidents only.

Support

Marketing campaign flow

Brief → copy → design → launch → measure · WIP-limited to keep launches honest.

Marketing

Ops & finance approvals

Two-person approval lane · audit-log export · cycle time reported per approver.

Ops

Release readiness board

Blockers surface in the "At risk" column · release-go gate tied to flow-score threshold.

Release
Browse the full library →

By the numbers

Verified claims, no asterisks.

  • 8,400+ Active engineering & product teams Across 71 countries
  • 41% Average lead-time reduction Reported within the first 90 days of onboarding, avg. across customer surveys
  • 99.98% Measured uptime · trailing 36 months Live status at status.i-kanban.net · SOC 2 Type II since 2021
  • 96 Platform releases in 2024 A release every 3.8 business days — we ship because we use the tool ourselves
Start your free trial 14-day trial · work-email gated · no credit card · cancel from settings